![](/images/new-backgrounds/1218570/21857019x1.webp)
Table of contents
| 4.1.2 | Janus arrangement | 60 |
5 | Configuring the motor | 63 | |
| 5.1 | Procedure | 63 |
| 5.1.1 | General mechanical conditions | 65 |
| 5.1.2 | Specification of the duty cycle | 65 |
| 5.1.3 | 66 | |
| 5.1.4 | Selecting the motors | ............... 68 |
| 5.1.5 | Uneven current load | 69 |
| 5.1.6 | Motor | ......... 69 |
| 5.1.7 | 70 | |
| 5.1.8 | More than one torque motor on one axes | 71 |
| 5.1.9 | Checking the moments of inertia | 71 |
| 5.1.10 | Selecting the drive system components for the power connection | 72 |
| 5.1.11 | Calculating the required infeed power | 72 |
| 5.2 | Example(s) | 73 |
| 5.3 | 78 | |
6 | Motor assembly | 81 | |
| 6.1 | Motor assembly | 81 |
| 6.1.1 | Procedure for installing the motor | 86 |
| 6.1.2 | Cooler connection | ................ 90 |
| 6.1.3 | Information on routing cables | 92 |
| 6.1.4 | Checking the work carried out | 93 |
| 6.1.5 | Installation examples | 94 |
| 6.2 | Protecting the motor components | 101 |
7 | System integration | 103 | |
| 7.1 | System requirements | 103 |
| 7.2 | Encoders | 108 |
| 7.3 | Bearings | 111 |
| 7.4 | Braking concepts | ............. 112 |
8 | Interfaces | 115 | |
| 8.1 | Overview | 115 |
| 8.2 | Electrical connections | 144 |
| 8.2.1 | Power connection | 145 |
| 8.2.2 | Signal connection | 145 |
| 8.2.3 | Shielding, grounding, and equipotential bonding | 149 |
| 8.2.4 | Requirements for the motor supply cables | 150 |
| 8.3 | Cooler connection | 150 |
9 | Commissioning | 163 | |
| 9.1 | Safety guidelines for commissioning | 163 |
| 9.2 | Procedure | 166 |
| 9.2.1 | Checks | .................... 166 |
| 9.2.2 | Commissioning single motors | 168 |
| 9.2.3 | Commissioning motors connected in parallel | 182 |
| 9.2.4 | Measuring the EMF voltages | ...... 185 |
10 | Operation | 187 | |
10 |
|
| 1FW6 |
| Configuration Manual, 05/2009, |