Color Maintenance Checklist

 

 

 

 

FC-22

 

 

 

 

 

 

 

 

Section

 

Item to inspect

Cleaning

Coating

Replace every

Operation

Remarks

 

 

 

 

 

1K copies

check

<P-1>

 

1.

Developer material (Y, M, C)

 

 

30

 

9

 

2.

Doctor blade

Z(30/60)

 

>

 

1

 

3.

Developer unit drum seal

Z(60)

 

>

 

10

 

4.

Front/rear sides of developer unit

Z(60)

 

 

 

2

 

5.

Oil seal portion

 

AV

 

 

 

 

 

 

 

 

 

 

 

 

6.

Cleaning blade

 

 

60

 

3

 

 

 

 

 

 

 

<P23-I13>

 

 

 

 

 

 

 

 

 

7.

Recovery blade

Z(60)

 

>

 

4

 

8.

Felt seals on both ends of the cleaning blade

Z(60)

 

>

 

 

Processing

9.

Entire developer/cleaner unit

Z(60)

 

 

 

8

unit (EPU)

10.

Main charger case

Z(60)

 

 

 

7

(Color (Y, M,

11.

Dischiarge LED

Z(60)

 

 

 

 

12.

Wire cleaning pad

 

 

60

Z

<P22-I21>

C) related

 

 

13.

Main charger wire

 

 

60

 

7

 

 

 

 

parts)

 

 

 

 

 

 

<P22-I15>

 

 

 

 

 

 

 

 

 

14.

Main charger grid

 

 

60

 

<P22-I24>

 

 

 

 

 

 

 

 

 

15.

Main charger contact

Z(60)

 

 

 

 

 

 

 

 

 

 

 

 

 

16.

Drum

 

 

60

 

5

 

 

 

 

 

 

 

<P22-I38>

 

17.

Drum shaft

Z(60)

 

 

 

 

 

18.

Drum thermister

Z(60)

 

 

 

 

 

19.

Toner recovery auger drive

Z(60)

W

 

 

 

Image quality

35.

Image quality sensor’s area

Z(60)

 

 

 

 

control

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Color

36.

Color registration sensor

Z(60)

 

 

 

 

registration

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Laser unit

37.

Slit glass

Z(60)

 

 

 

 

Note: 1. <P-I> in the “Remarks” column indicates a page item in the Parts List.

January 2000 © TOSHIBA TEC

2 - 5

FC-22 PREVENTIVE MAINTENANCE

Page 109
Image 109
Toshiba manual Color Maintenance Checklist FC-22