(7)When the copier starts operating, a message “WAIT” is shown and the developer material filling starts (approx. 2 minutes and 30 seconds).

WAIT

(8)Approx. 2 minutes after the developer material filling is finished, the following display appears:

Bn C n A n

Y:6.30V M:6.38V C:6.38V K:6.38V

61% Y:4.00V M:4.00V C:4.00V K:4.00V

Upper line B : Current sensor voltages (V)

Middle line C : Humidity (%)

Lower line A : Target values (V) for adjustment reference voltages

Note:

The current sensor voltages (V) shown in B automatically changes, gradually approaching the target values for adjustment reference voltages shown in A.

Values are displayed only for the developer materials being filled.

(9)In 30 to 60 seconds, the current sensor voltages (V) in B are converged to those in A. The humidity shown in C disappears, and the sensor output control values (bit values) are shown instead.

B n

C n

A n

Y:4.00V M:4.00V C:4.00V K:4.00V

Y:135 M: 135 C: 135 K: 135 Y:4.00V M:4.00V C:4.00V K:4.00V

Note: Be careful that the values in A, B and C vary with humidity.

A: Target value (V) for adjustment reference voltage

Humidity (%)

Y

M

C

K

 

 

 

 

 

~59.9

4.00

4.00

4.00

4.00

 

 

 

 

 

60.0~74.9

4.14

4.14

4.14

4.12

 

 

 

 

 

75.0~

4.35

4.35

4.35

4.31

 

 

 

 

 

January 2000 © TOSHIBA TEC

1 - 47

FC-22 ADJUSTMENT

Page 65
Image 65
Toshiba FC-22 manual Wait