(3)Remove 2 screws, and then take off the sen- sor rail.

Note:

When installing the movable tray drive unit, fix it at the position where the gap between the center mark of the scale on the sensor rail and the edge of the movable tray posi- tion-a sensor is from 0 to 1 mm. Be sure to adjust the installation position by shifting the movable tray shift frame and measure the positions at the upper and lower measuring points on the sensor rail as shown in the fig- ure.

(4)Release the harness out of 3 clamps, and then disconnect the connector of CN15 on the FIN board.

(5)Disconnect the connector of the movable tray shift motor.

Sensor rail

Fig. 4-203

Sensor rail

Sensor

Measure

0mm to 1.0mm

Fig. 4-204

FIN board

Cramp

Fig. 4-205

MJ-1103/1104

© 2008, 2009 TOSHIBA TEC CORPORATION All rights reserved

DISASSEMBLY AND INSTALLATION

 

4 - 72

Page 140
Image 140
Toshiba MJ-1104, MJ-1103 service manual Sensor rail