(9)Remove 2 screws, and then take off the gate solenoid.

Gate solenoid

Fig. 4-242

Note:

When installing the gate solenoid, install the bracket with 2 screws as shown in the figure, and then fix it at the position where the gap between the gate flap and the shaft of the entrance roller falls within 0.4 to 0.8 mm.

Bracket

 

B

Gate flap

 

A

 

 

 

 

0.4mm to 0.8mm

A

 

B

 

 

 

 

Shaft of the entrance roller

 

 

Fig. 4-243

[H] Transport path switching solenoid (SOL5) (MJ-1104)

 

(1)

Take off the right upper cover.

 

 

P.4-7 "[J] Right upper cover"

 

(2)

Take off the relay guide, feeding discharge

 

 

brush and right cover.

 

 

P.4-7 "[K] Relay guide / Feeding dis-

 

 

charge brush / Right cover"

FIN board

(3)

Remove 4 screws of the FIN board bracket.

bracket

 

 

Fig. 4-244

MJ-1103/1104

© 2008, 2009 TOSHIBA TEC CORPORATION All rights reserved

DISASSEMBLY AND INSTALLATION

 

4 - 86

Page 154
Image 154
Toshiba MJ-1103 Remove 2 screws, and then take off the gate solenoid, Transport path switching solenoid SOL5 MJ-1104