Enviro 6G50 76N instruction manual Vent Termination Figure, Power Vent Wiring Schematic Figure

Page 22

Align holes by drilling a hole through center of the template

Slide the wall plate over the pipe to stop against the vent terminal.

from the inside through to the outside. The template can now

Place a bead of caulking (not supplied) around the gap between the

be positioned on the outside wall using the drilled hole as a

pipe and cover plate. Apply enough to fill some of the gap between

centering point for the template.

the pipe and wall. Place some of the caulking on the back of the plate

 

to hold it against the wall after installation. If the vent pipe is installed

3. A) MASONRY SIDE WALLS

up to the wall, with a coupling on the end against the wall opening,

Chisel an opening approximately one half inch (1.3 cm) larger

the pipe with the vent terminal can be prepared for gluing before

than the marked circle.

inserting through the wall. Slide the pipe through the wall and insert

 

into the coupling on the other side of the wall, making sure that the

B) WOODEN SIDE WALLS

vent terminal ends up pointed in the correct position, see Figure 18.

Drill a pilot hole approximately one quarter inch (0.64 cm) outside

 

of the marked circle. This pilot hole is used as a starting point

 

for a saws-all or sabre saw blade. Cut around the marked circle

 

staying approximately one quarter inch (0.64 cm) outside of the

 

line. (This will allow the vent to easily slide through the opening.

 

The resulting gap will be covered up by the Vent Terminal cover

 

plate.) Repeat this step on inside wall if necessary.

 

SEQUENCE OF INSTALLATIONS, FIGURE 18

 

Cut a length of PVC pipe about 3.5 inches (8.9 cm) longer than wall

VENT TERMINATION - FIGURE 18.

thickness at the opening. Glue vent terminal to this section of pipe.

CAUTION

LABEL ALL WIRES PRIOR TO DISCONNECTION WHEN SERVICING CONTROLS. WIRING ERRORS CAN CAUSE IMPROPER AND DANGEROUS OPERATION. VERIFY PROPER OPERATION AFTER SERVICING.

POWER VENT WIRING SCHEMATIC - FIGURE 19.

22

Image 22
Contents Power Vented GAS Models W/HOT Surface Ignition Whenever maintenance adjustment or service is requiredApprovals Safe INSTALLATION, USE and ServiceImportant Definitions General Safety Information General Safety Information Table of Contents To Install or Operate the Water Heater Qualified Installer or Service AgencyPreparing for the Installation IntroductionReplacement Parts and Deliming Products Typical InstallationRelief Valve Elbow Access Door Condensate Hose and Drain PAN Mixing Valves Less Severe Burns 2nd & 3rd Degree Most Severe BurnsLocating the NEW Water Heater Facts to Consider About the LocationInsulation Blankets Air REQUIREMENTsFresh Air Openings For Confined Spaces Unconfined SpaceConfined Space Outdoor Air Through Two OpeningsOutdoor AIR Through TWO Vertical Ducts Outdoor AIR Through TWO Horizontal DuctsAIR from Other Indoor Spaces Water Piping Installing the NEW Water HeaterChemical Vapor Corrosion Space Heating and Potable Water SystemThermal Expansion Temperature-Pressure Relief ValveValve and Pipe Insulation High Altitude Installation Valve Discharge Pipe RequirementsGAS Piping with Flexible Connector GAS Piping with ALL Black Iron Pipe to GAS ControlFilling the Water Heater Vent Pipe AssemblySediment Traps VentingTermination Clearances Sidewall Power Vent Vent Pipe TerminationCondensate Planning the Vent SystemBreathing Hazard Carbon Monoxide Gas Blower Assembly Installation Vent Terminal INSTALLATION, SidewallPower Vent Wiring Schematic Figure Vent Termination FigureInstallation of Vent SYSTEM, Sidewall Installation of Vertical Vent SystemVent Attenuation Assembly Installation Vertical VAA Installations RecommendedInch vent Horizontal VAA Installations Inch vent Vertical VAA InstallationsCould cause illness, asphyxiation and/or even death Page Temperature Regulation Water TemperatureStart UP Conditions For Your InformationOperational Conditions Periodic Maintenance Anode ROD InspectionTemperature-Pressure Relief Valve Test Draining and FlushingTo Drain the Water Heater Storage Tank ServiceTo Flush the Water Heater Storage Tank Leakage Checkpoints Repair Parts List Trouble Shooting Troubleshooting GuidelinesLED Status Problem Solution LED Status Problem Solution Troubleshooting Guidelines Troubleshootinotesg Guidelines Troubleshootinotesg Guidelines Conditions and Exceptions Service and Labor ResponsibilityClaim Procedure Limitation on Implied WarrantiesGSW Water Heating Hill Street West Fergus, on Canada N1M CHAUFFE-EAU AU GAZ Résidentiel ImpriméApprobations INSTALLATION, Utilisation ET Service EN Toute SécuritéDéfinitions Importantes Avertissement Information DE Sécurité Générale AVERTISSEMENT Emplacement DU Nouveau CHAUFFE-EAU Table DES MatièresInstallateur ou organisme de service qualifié Préparation pour l’installationInstallation Type Piècesde Rechange ET Produits DE DétartrageTuyau DE Condensat ET BAC DE Vidange Mélangeurs TableauEmplacement DU Nouveau CHAUFFE-EAU Faits à prendre en considération concernant l’emplacementProtections Thermiques Quantité d’air NécessaireOuvertures d’air frais pour espaces clos Espaces non closEspace Clos Air extérieur à travers deux ouverturesAIR Externe À Travers Deux Conduits Verticaux AIR Externe À Travers Deux Conduits HorizontauxAIR Provenant D’AUTRES Espaces Intérieurs Conduites d’eau Installation DU CHAUFFE-EAUCorrosion DE Vapeur Chimique Chauffage DES Locaux ET Systèmes D’EAU PotableExpansion thermique Soupape de décharge à sécurité thermiqueInstallation À Haute Altitude Pressure Relief Valve thermique. discharge outletConduite de gaz Bacs DE SédimentationEnsemble Tuyau DE Ventilation Remplissage du chauffe-eauVentilation Terminaison DU Tuyau DE Ventilation Ventilation À AIR PulséSi un tuyau de ventilation de 2 po est utilisé Planification DU Système DE VentilationCondensat Si un tuyau de ventilation de 3 po ou 4 po est utiliséInstallation DE L’ENSEMBLE DE LA Soufflante Installation DU Terminal D’ÉVENT, Paroi LatéraleAvertissement Terminaison DE L’ÉVENT FigureSchéma DU Câblage DE L’ÉVENT À AIR Propulsé Figure Installation DU Système DE VENTILATION, Paroi Latérale Installation DU Système DE Ventilation VerticalInstallation DE L’ENSEMBLE D’ATTÉNUATION DE L’ÉVENT Installations verticales de l’EAE RecommandéesÉvent de 4 po Installations verticales d’EAE Évent de 3 po Installations horizontales d’EAEÉvent de 3 po Installations verticales d’EAE Évent de 4 po Installations horizontales d’EAEQUE Faire EN CAS D’ODEUR DE GAZ NE PAS Tenter D’ALLUMER LE Brûleur À LA MainRégulation DE Température Bouton « Cooler » plus froid jusqu’à ce que le réglagePour Votre Information Conditions DE Mise EN ServiceConditions Opérationnelles Entretien Périodique Inspection DE LA Tige D’ANODEDdanger Test de soupape de décharge à sécurité thermiquePour Vidanger LE Réservoir DE Stockage DU CHAUFFE- EAU Vidange ET RinçagePour Rincer LE Réservoir DE Stockage DU CHAUFFE-EAU Points DE Vérification DES Fuites Liste DE Pièces DE Rechange Directives DE Dépannagep GE Statut DEL Problème SolutionDépannage ’assurer que le capteur de flamme établit un bon contact Problème Cause Solution Directivesmarquesde Dépannage Directivesmarquesde Dépannage Garantie Limitée Pour GAZ Résidentiel