Enviro 6G50 76N Termination Clearances Sidewall Power Vent, Vent Pipe Termination

Page 19

Termination Clearances Sidewall Power Vent

POWER VENT

(using room air for combustion)

EXTERIOR CLEARANCES FOR SIDEWALL VENT TERMINATION

G

D

vE

L B

v

V

A

 

 

C

 

 

B

 

 

 

 

B

V

 

 

 

 

 

 

 

 

FIXED

 

 

 

 

 

 

 

 

E

 

V

 

FIXED

 

 

V

 

OPERABL

CLOSED

 

 

 

 

 

 

 

 

 

 

CLOSED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

OPERABL

E

B

 

 

V

 

X

 

F

 

 

 

 

 

 

 

 

 

 

 

B

 

J

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B

 

 

 

 

 

 

 

 

 

H

M

V

X

 

 

K

V

VENT TERMINAL X AIR SUPPLY INLET

AREA WHERE TERMINAL IS NOT PERMITTED

FIGURE 15.

Vent terminal clearances for “Power Vent” installations. Power Vent configurations use room air for combustion.

 

 

Canadian Installations

 

 

Canadian Installations

 

 

 

 

 

 

 

Clearance above grade,

 

 

Clearance to each side

3 feet (91 cm) within a height 15 feet

A

 

H

of center line extended

veranda, porch, deck or

12 inches (30 cm)

(4.5 m) above the meter/

above meter/regulator

 

balcony

 

 

assembly

regulator assembly

 

 

 

 

 

 

 

 

 

 

 

 

 

6 inches (15 cm) for appliances up to

 

 

 

 

Clearance to window

10,000 Btu/hr (3 kW), 12 inches (30

 

Clearance to service

 

B

cm) for appliances between 10,000

I

 

or door that may be

regulator vent outlet

3 feet (91 cm)

Btu/hr (3 kW) and 100,000 Btu/hr (30

 

opened

kW), 36 inches (91 cm) for appliances

 

 

 

 

 

above 100,000 Btu/hr (30 kW)

 

 

 

 

 

 

 

 

 

 

 

 

 

Clearance to a non

6 inches (15 cm) for appliances up

 

 

 

 

to 10,000 Btu/hr (3 kW), 12 inches

C

Clearance to

 

J

mechanical air supply

(30 cm) for appliances between

permanently closed

12 inches (30 cm)*

inlet into building or

10,000 Btu/hr (3 kW) and 100,000

 

window

 

 

combustion air inlet to

Btu/hr (30kW), 36 inches (91cm)

 

 

 

 

any other appliance

for appliances above 100,000 Btu/

 

 

 

 

 

hr (30 kW)

 

Vertical clearance to

 

 

 

 

 

ventilated soffit located

 

 

Clearance to a

 

D

above the terminal

12 inches (30 cm)*

K

 

within a horizontal

mechanical air supply

6 feet (1.83 m)

 

distance of 2 feet (61

 

 

inlet

 

 

cm) from the center line

 

 

 

 

 

of the terminal

 

 

 

 

 

Clearance to

 

 

Clearance above paved

 

E

12 inches (30 cm)*

L

sidewalk or paved

7 feet (2.13 m)†

unventilated soffit

driveway located on

 

 

 

 

public property

 

F

cornerClearance to outside

 

M

Clearance under

 

2 feet (60 cm)*

veranda, porch, deck, or

12 inches (30 cm) ‡

 

 

 

 

balcony

 

G

cornerClearance to inside

18 inches (45 cm)*

 

 

 

In accordance with the current CSA B149.1, Natural Gas and Propane Installation Code.

A vent shall not terminate directly above a sidewalk or paved driveway that is located between two single family dwellings and serves both dwellings.

‡ Permitted only if veranda, porch, deck, or balcony is fully open on a minimum of two sides beneath the floor.

* Clearance in accordance with local installation codes and the requirements of the gas supplier and the manufacturer’s installation instructions.

VENT PIPE TERMINATION

The first step is to determine where the vent pipe will terminate. See Figures 15, 20 and 21. The vent may terminate through a sidewall as shown in Figure 20 or through the roof as shown in Figure 21.

The vent system must terminate so that proper clearances are maintained as cited in local codes or the current edition of the Natural Gas and Propane Installation Code (CAN/CSA-B149.1).

Instructions on proper installation through a sidewall are provided

in Figure 15.

Plan the vent system layout so that proper clearances are maintained from plumbing and wiring.

Vent pipes serving power vented appliances are classified by building codes as “vent connectors”. Required clearances from combustible materials must be provided in accordance with information in this manual under LOCATING THE NEW WATER HEATER and INSTALLING THE WATER HEATER, and with the Natural Gas and Propane Installation Code (CSN/CSA-B149.1) and local codes.

19

Image 19
Contents Whenever maintenance adjustment or service is required Power Vented GAS Models W/HOT Surface IgnitionApprovals Safe INSTALLATION, USE and ServiceImportant Definitions General Safety Information General Safety Information Table of Contents Introduction Qualified Installer or Service AgencyPreparing for the Installation To Install or Operate the Water HeaterReplacement Parts and Deliming Products Typical InstallationRelief Valve Elbow Access Door Condensate Hose and Drain PAN Less Severe Burns 2nd & 3rd Degree Most Severe Burns Mixing ValvesFacts to Consider About the Location Locating the NEW Water HeaterAir REQUIREMENTs Insulation BlanketsOutdoor Air Through Two Openings Unconfined SpaceConfined Space Fresh Air Openings For Confined SpacesOutdoor AIR Through TWO Vertical Ducts Outdoor AIR Through TWO Horizontal DuctsAIR from Other Indoor Spaces Space Heating and Potable Water System Installing the NEW Water HeaterChemical Vapor Corrosion Water PipingThermal Expansion Temperature-Pressure Relief ValveValve and Pipe Insulation Valve Discharge Pipe Requirements High Altitude InstallationGAS Piping with ALL Black Iron Pipe to GAS Control GAS Piping with Flexible ConnectorVenting Vent Pipe AssemblySediment Traps Filling the Water HeaterVent Pipe Termination Termination Clearances Sidewall Power VentCondensate Planning the Vent SystemBreathing Hazard Carbon Monoxide Gas Vent Terminal INSTALLATION, Sidewall Blower Assembly InstallationVent Termination Figure Power Vent Wiring Schematic FigureInstallation of Vertical Vent System Installation of Vent SYSTEM, SidewallVertical VAA Installations Recommended Vent Attenuation Assembly InstallationInch vent Horizontal VAA Installations Inch vent Vertical VAA InstallationsCould cause illness, asphyxiation and/or even death Page Water Temperature Temperature RegulationStart UP Conditions For Your InformationOperational Conditions Anode ROD Inspection Periodic MaintenanceDraining and Flushing Temperature-Pressure Relief Valve TestTo Drain the Water Heater Storage Tank ServiceTo Flush the Water Heater Storage Tank Leakage Checkpoints Repair Parts List Trouble Shooting Troubleshooting GuidelinesLED Status Problem Solution LED Status Problem Solution Troubleshooting Guidelines Troubleshootinotesg Guidelines Troubleshootinotesg Guidelines Limitation on Implied Warranties Service and Labor ResponsibilityClaim Procedure Conditions and ExceptionsGSW Water Heating Hill Street West Fergus, on Canada N1M Imprimé CHAUFFE-EAU AU GAZ RésidentielApprobations INSTALLATION, Utilisation ET Service EN Toute SécuritéDéfinitions Importantes Information DE Sécurité Générale Avertissement AVERTISSEMENT Table DES Matières Emplacement DU Nouveau CHAUFFE-EAUPréparation pour l’installation Installateur ou organisme de service qualifiéPiècesde Rechange ET Produits DE Détartrage Installation TypeTuyau DE Condensat ET BAC DE Vidange Tableau MélangeursFaits à prendre en considération concernant l’emplacement Emplacement DU Nouveau CHAUFFE-EAUQuantité d’air Nécessaire Protections ThermiquesAir extérieur à travers deux ouvertures Espaces non closEspace Clos Ouvertures d’air frais pour espaces closAIR Externe À Travers Deux Conduits Verticaux AIR Externe À Travers Deux Conduits HorizontauxAIR Provenant D’AUTRES Espaces Intérieurs Chauffage DES Locaux ET Systèmes D’EAU Potable Installation DU CHAUFFE-EAUCorrosion DE Vapeur Chimique Conduites d’eauSoupape de décharge à sécurité thermique Expansion thermiquePressure Relief Valve thermique. discharge outlet Installation À Haute AltitudeBacs DE Sédimentation Conduite de gazEnsemble Tuyau DE Ventilation Remplissage du chauffe-eauVentilation Ventilation À AIR Pulsé Terminaison DU Tuyau DE VentilationSi un tuyau de ventilation de 3 po ou 4 po est utilisé Planification DU Système DE VentilationCondensat Si un tuyau de ventilation de 2 po est utiliséInstallation DU Terminal D’ÉVENT, Paroi Latérale Installation DE L’ENSEMBLE DE LA SoufflanteAvertissement Terminaison DE L’ÉVENT FigureSchéma DU Câblage DE L’ÉVENT À AIR Propulsé Figure Installation DU Système DE Ventilation Vertical Installation DU Système DE VENTILATION, Paroi LatéraleInstallations verticales de l’EAE Recommandées Installation DE L’ENSEMBLE D’ATTÉNUATION DE L’ÉVENTÉvent de 4 po Installations horizontales d’EAE Évent de 3 po Installations horizontales d’EAEÉvent de 3 po Installations verticales d’EAE Évent de 4 po Installations verticales d’EAENE PAS Tenter D’ALLUMER LE Brûleur À LA Main QUE Faire EN CAS D’ODEUR DE GAZBouton « Cooler » plus froid jusqu’à ce que le réglage Régulation DE TempératurePour Votre Information Conditions DE Mise EN ServiceConditions Opérationnelles Inspection DE LA Tige D’ANODE Entretien PériodiqueTest de soupape de décharge à sécurité thermique DdangerPour Vidanger LE Réservoir DE Stockage DU CHAUFFE- EAU Vidange ET RinçagePour Rincer LE Réservoir DE Stockage DU CHAUFFE-EAU Points DE Vérification DES Fuites Liste DE Pièces DE Rechange Directives DE Dépannagep GE Statut DEL Problème SolutionDépannage ’assurer que le capteur de flamme établit un bon contact Problème Cause Solution Directivesmarquesde Dépannage Directivesmarquesde Dépannage Garantie Limitée Pour GAZ Résidentiel