INSTALLATION OF VENT SYSTEM, SIDEWALL

With the route of the venting system and selection of materials completed, as discussed in the section of this manual titled PLANNING THE VENT

SYSTEM, the through the wall vent terminal in place and the first section of piping, up to first elbow, installed at the blower it is time to complete

the installation of the venting system for the sidewall installation.

FIGURE 20

It is recommended that the completion of the venting system start at the blower assembly and run to the coupling on the inside wall of the vent terminal, Figure18.

The vent system piping should be supported every 5 feet (1.5 m) of vertical run and every 3 feet (91 cm) of horizontal run. Follow vent pipe manufacturer’s instructions for proper joining procedures.

If necessary to achieve the 12” minimum clearance above the highest anticipated snow level, install a snorkel as shown in bottom portion of Figure 20.

NOTE: With the installation of a snorkel it is necessary to use two 90° elbows that shall be considered along with the

additional vent pipe when calculating maximum equivalent feet of venting.

INSTALLATION OF VERTICAL VENT SYSTEM

A proper flashing or “BOOT” should be used to seal the pipe where it exits the roof. The total vent system should not exceed the equivalent feet of pipe as listed in Table 1.

Provide support for all pipe protruding through the roof. All piping should be properly secured. The vent system piping should be supported every 5 feet (1.5 m) of vertical run and every 3 feet (91 cm) of

horizontal run. Follow vent pipe manufacturer’s instructions for proper

joining procedures.

FIGURE 21

IMPORTANT

The vent system must terminate so that proper clearances are maintained as cited in local codes or the current edition of the Natural Gas and Propane Installation Code (CAN/CSA-B149.1) and as listed below:

1.Vent Termination must extend a minimum of 12 inches (30 cm) above roof or 12 inches (30 cm) above the anticipated snow level to prevent blockage of the vent termination, as shown in Figures 20 and 21.

23

Image 23
Contents Whenever maintenance adjustment or service is required Power Vented GAS Models W/HOT Surface IgnitionImportant Definitions Safe INSTALLATION, USE and ServiceApprovals General Safety Information General Safety Information Table of Contents Introduction Qualified Installer or Service AgencyPreparing for the Installation To Install or Operate the Water HeaterRelief Valve Elbow Access Door Typical InstallationReplacement Parts and Deliming Products Condensate Hose and Drain PAN Less Severe Burns 2nd & 3rd Degree Most Severe Burns Mixing ValvesFacts to Consider About the Location Locating the NEW Water HeaterAir REQUIREMENTs Insulation BlanketsOutdoor Air Through Two Openings Unconfined SpaceConfined Space Fresh Air Openings For Confined SpacesAIR from Other Indoor Spaces Outdoor AIR Through TWO Horizontal DuctsOutdoor AIR Through TWO Vertical Ducts Space Heating and Potable Water System Installing the NEW Water HeaterChemical Vapor Corrosion Water PipingValve and Pipe Insulation Temperature-Pressure Relief ValveThermal Expansion Valve Discharge Pipe Requirements High Altitude InstallationGAS Piping with ALL Black Iron Pipe to GAS Control GAS Piping with Flexible ConnectorVenting Vent Pipe AssemblySediment Traps Filling the Water HeaterVent Pipe Termination Termination Clearances Sidewall Power VentBreathing Hazard Carbon Monoxide Gas Planning the Vent SystemCondensate Vent Terminal INSTALLATION, Sidewall Blower Assembly InstallationVent Termination Figure Power Vent Wiring Schematic FigureInstallation of Vertical Vent System Installation of Vent SYSTEM, SidewallVertical VAA Installations Recommended Vent Attenuation Assembly InstallationCould cause illness, asphyxiation and/or even death Inch vent Vertical VAA InstallationsInch vent Horizontal VAA Installations Page Water Temperature Temperature RegulationOperational Conditions For Your InformationStart UP Conditions Anode ROD Inspection Periodic MaintenanceDraining and Flushing Temperature-Pressure Relief Valve TestTo Flush the Water Heater Storage Tank ServiceTo Drain the Water Heater Storage Tank Leakage Checkpoints Repair Parts List LED Status Problem Solution Troubleshooting GuidelinesTrouble Shooting LED Status Problem Solution Troubleshooting Guidelines Troubleshootinotesg Guidelines Troubleshootinotesg Guidelines Limitation on Implied Warranties Service and Labor ResponsibilityClaim Procedure Conditions and ExceptionsGSW Water Heating Hill Street West Fergus, on Canada N1M Imprimé CHAUFFE-EAU AU GAZ RésidentielDéfinitions Importantes INSTALLATION, Utilisation ET Service EN Toute SécuritéApprobations Information DE Sécurité Générale Avertissement AVERTISSEMENT Table DES Matières Emplacement DU Nouveau CHAUFFE-EAUPréparation pour l’installation Installateur ou organisme de service qualifiéPiècesde Rechange ET Produits DE Détartrage Installation TypeTuyau DE Condensat ET BAC DE Vidange Tableau MélangeursFaits à prendre en considération concernant l’emplacement Emplacement DU Nouveau CHAUFFE-EAUQuantité d’air Nécessaire Protections ThermiquesAir extérieur à travers deux ouvertures Espaces non closEspace Clos Ouvertures d’air frais pour espaces closAIR Provenant D’AUTRES Espaces Intérieurs AIR Externe À Travers Deux Conduits HorizontauxAIR Externe À Travers Deux Conduits Verticaux Chauffage DES Locaux ET Systèmes D’EAU Potable Installation DU CHAUFFE-EAUCorrosion DE Vapeur Chimique Conduites d’eauSoupape de décharge à sécurité thermique Expansion thermiquePressure Relief Valve thermique. discharge outlet Installation À Haute AltitudeBacs DE Sédimentation Conduite de gazVentilation Remplissage du chauffe-eauEnsemble Tuyau DE Ventilation Ventilation À AIR Pulsé Terminaison DU Tuyau DE VentilationSi un tuyau de ventilation de 3 po ou 4 po est utilisé Planification DU Système DE VentilationCondensat Si un tuyau de ventilation de 2 po est utiliséInstallation DU Terminal D’ÉVENT, Paroi Latérale Installation DE L’ENSEMBLE DE LA SoufflanteSchéma DU Câblage DE L’ÉVENT À AIR Propulsé Figure Terminaison DE L’ÉVENT FigureAvertissement Installation DU Système DE Ventilation Vertical Installation DU Système DE VENTILATION, Paroi LatéraleInstallations verticales de l’EAE Recommandées Installation DE L’ENSEMBLE D’ATTÉNUATION DE L’ÉVENTÉvent de 4 po Installations horizontales d’EAE Évent de 3 po Installations horizontales d’EAEÉvent de 3 po Installations verticales d’EAE Évent de 4 po Installations verticales d’EAENE PAS Tenter D’ALLUMER LE Brûleur À LA Main QUE Faire EN CAS D’ODEUR DE GAZBouton « Cooler » plus froid jusqu’à ce que le réglage Régulation DE TempératureConditions Opérationnelles Conditions DE Mise EN ServicePour Votre Information Inspection DE LA Tige D’ANODE Entretien PériodiqueTest de soupape de décharge à sécurité thermique DdangerPour Rincer LE Réservoir DE Stockage DU CHAUFFE-EAU Vidange ET RinçagePour Vidanger LE Réservoir DE Stockage DU CHAUFFE- EAU Points DE Vérification DES Fuites Liste DE Pièces DE Rechange Dépannage Statut DEL Problème SolutionDirectives DE Dépannagep GE ’assurer que le capteur de flamme établit un bon contact Problème Cause Solution Directivesmarquesde Dépannage Directivesmarquesde Dépannage Garantie Limitée Pour GAZ Résidentiel