6 Maintenance

Pump Maintenance

82

 

 

 

 

 

 

 

 

Table 3. Operating Life of Components for Edwards RV5 Vacuum Pump 82

 

 

Cleaning the Detector

83

 

 

 

 

 

 

 

Changing the Oil Mist Filter (RV5)

84

 

 

 

 

 

 

Reaction Cell Cleaning

85

 

 

 

 

 

 

 

Figure 23. Reaction Cell, PMT Housing and PMT Socket

86

 

 

 

Figure 24. Reaction Cell

86

 

 

 

 

 

 

 

Flow Sensor Calibration

88

 

 

 

 

 

 

 

Detector Sensitivity

89

 

 

 

 

 

 

 

 

Assembling the Dual Plasma Burner for Component Replacement with the SCD

90

 

Figure 25. Ferrule Placement on Lower Burner Tube

90

 

 

 

 

Figure 26. Proper Ferrule Orientation to the Large Ceramic Tube

91

 

 

Figure 27. Large Ceramic Tube Properly Inserted into the Quartz Heater Assembly

91

Figure 28. Orientation of the Double Taper Ferrule

92

 

 

 

 

Figure 29. Positioning the Upper Tube in the Union Fitting

92

 

 

 

Figure 30. Tightening the Heater Swivel Nut

93

 

 

 

 

 

Figure 31. Proper Alignment of the Burner

93

 

 

 

 

 

Assembling the Dual Plasma Burner for Component Replacement with the NCD

95

 

Figure 32. Ferrule Placement on Lower Burner Tube

95

 

 

 

 

Figure 33. Proper Ferrule Orientation to the Large Quartz Tube

96

 

 

Figure 34. The Quartz Tube Properly Inserted into the Quartz Heater Assembly

96

Figure 35. Burner Assembly Detail 97

 

 

 

 

 

 

Figure 36. Burner Assembly Alignment 97

 

 

 

 

 

Tube Replacement for the SCD

98

 

 

 

 

 

 

Figure 37. Orientation of the Double Taper Ferrule

98

 

 

 

 

Figure 38. Positioning the Upper Tube in the Union Fitting

99

 

 

 

Figure 39. Proper Ferrule Orientation to the Large Ceramic Tube

99

 

 

Figure 40. Large Ceramic Tube Properly Inserted into the Quartz Heater Assembly

100

Figure 41. Tightening the Heater Swivel Nut

100

 

 

 

 

 

Figure 42. Proper Alignment of the Burner

101

 

 

 

 

 

Tube Replacement for the NCD

102

 

 

 

 

 

 

Figure 43. Proper Ferrule Orientation to the Large Quartz Tube

102

 

 

Figure 44. Large Quartz Tube Properly Inserted into the Quartz Heater Assembly

103

Figure 45. NCD Tube Replacement Detail

104

 

 

 

 

 

Figure 46. NCD Tube Replacement Detail

104

 

 

 

 

 

14

Operation and Maintenance Manual

Page 14
Image 14
Agilent Technologies G6600-90006 manual Pump Maintenance