Step 1: Selecting a Location
41
Power Requirements
42
Step 2: Unpack and Inspect the Instrument
45
Required Installation Tools
Step 3: Set Up the Vacuum Pump
46
Installing the Edwards RV5 Pump Oil-Sealed Vacuum Pump 46
49
Installing the Welch Dry Piston Vacuum Pump
52
54
56
Step 6: Install the Signal Output Cables
58
Standard Cable Connection
HP 3390 Series Integrator Cable Connection
HP 3396 Integrator Cable Connection
HP 5890 GC Analog Input Board
Agilent 6890 GC Analog Input Board
Step 7: Install the Dual Plasma Burner
59
Step 8: Install the Dual Plasma Controller
60
61
12
Operation and Maintenance Manual