Bay Technical Associates none manual Index-7

Models: none

1 156
Download 156 pages 62.12 Kb
Page 155
Image 155

Index

power cables, 1-27specifications, C-2switch, 3-10

Power (Pwr) LED, 3-3

powering on the ARN, 3-10

PPPprotocol, Bay networks proprietary, B-11 PPP wide area protocol, worksheet for, B-13preparing for installation, 1-2 to 1-8

Q

Quick-Start procedure commands, B-16 inst_arn.bat script, 2-16 running, 2-16, B-15 using, 2-16,B-16worksheet, B-4 to B-7

R

rack-mounting procedure for, 1-6 to 1-8required hardware, 1-6

receive (RX) LED, 3-8

receive (Rx) LED, 3-4,3-5

receive data (RxD) LED, 3-7

received line signal detection (RLSD) LED, 3-6, 3-8

received line signal detection 3 (RLSD3) LED, 3-6

received line signal detection 4 (RLSD4) LED, 3-6

received line signal detection 5 (RLSD5) LED, 3-6

receiver (RCVR) LED, 3-4, 3-5

redundant power supply (RPS) LED, 3-3

reset button LEDs and, 3-11 using, 3-11

RIP routing protocol, worksheet for, B-7

RJ-11 interface pin assignments, C-13

RMON (remote monitoring), 3-3

router software image default boot location, 2-4 defined, 2-1

RS-232 connections

console (service) interface, C-13serial interface, C-8

service modem interface, C-14

RS-422 connections, C-8

RS-530 connections, C-8

rubber feet, using, 1-5

Run LED, 3-3

S

serial

cables, connecting, 1-15interfaces

adapter module, 1-10adapter module LED, 3-6base module LEDs, 3-6 configuring, A-2connecting to, 1-15expansion module, 1-9 expansion module LEDs, 3-6 ifconfig settings, A-2

pin assignments, C-9 specifications, C-8

shipment contents, verifying, 1-2

site requirements, 1-5, C-1

SMDS wide area protocol, worksheet for, B-15

software image

default boot location, 2-4 defined, 2-1

specifying location of, A-7

space requirements, C-1

specifications electrical, C-2 environmental, C-2

114200 Rev. A

Index-7

Page 155
Image 155
Bay Technical Associates none manual Index-7