Bay Technical Associates none manual Installing the ARN, Verifying Site Requirements

Models: none

1 156
Download 156 pages 62.12 Kb
Page 35
Image 35

Installing the BayStack Advanced Remote Node

Verifying Site Requirements

The installation site must provide a certain amount of free space around the ARN to dissipate heat, as detailed in Table 1-1.

Table 1-1.

Installation Space Requirements

 

 

 

 

 

Width

 

Depth (minimum)

Depth (for servicing)

 

 

 

22.5 in. (57.2 cm)

15 in. (38.1 cm)

25 in. (63.5 cm)

 

 

 

 

In addition, the installation site must meet the electrical and environmental specifications listed in Appendix C.

Caution: You must use grounded electrical power outlets with the ARN.

Installing the ARN

Once you are ready to install the ARN in its final location, you can

Position the ARN on a flat, sturdy, horizontal surface.

Mount the ARN in an electronic enclosure rack.

Positioning the ARN on a Flat Surface

When positioning the ARN on a flat surface, make sure that the surface is

Large enough for the ARN to operate properly

Sturdy enough to support the combined weight of the ARN and any cables that you connect

We recommend that you place the self-adhesive, rubber feet on the bottom of the ARN chassis (shipped with the ARN). These feet not only protect the surface on which you position the ARN, they provide added friction against the weight of any cables that you attach to the device.

114200 Rev. A

1-5

Page 35
Image 35
Bay Technical Associates none manual Installing the ARN, Verifying Site Requirements, Positioning the ARN on a Flat Surface