Installation

2.6.4Optional Cabinets

The Maintenance Bypass Cabinet must be cabled and bolted to the Liebert NX before the UPS and bypass cabinet are moved into their final position. Connect the input wiring to the Maintenance Bypass Cabinet ONLY after the units are connected and positioned.

Battery cabinets may be bolted to either side of the Liebert NX; see Figure 1.

Figure 1 Cabinet arrangement—Liebert®NXunits and battery cabinets

Liebert

Battery

NX

Cabinet

UPS

 

Front of Units

Battery

Battery

Battery

Liebert

NX

Cabinet

Cabinet

Cabinet

UPS

 

 

 

Battery

Liebert

NX

Cabinet

UPS

 

Front of Units

Liebert

Battery

Battery

Battery

NX

Cabinet

Cabinet

Cabinet

UPS

 

 

 

Front of Units

Front of Units

Battery Cabinet

Liebert

NX

UPS

Battery Cabinet

Liebert

NX

UPS

Multi-Module Parallel Cabinet

Liebert

NX

UPS

Battery Cabinet

Liebert

NX

UPS

Battery Cabinet

Front of Units

11

Page 21
Image 21
Emerson 40-200KVA user manual Optional Cabinets, Front of Units