Installation
2.6.4Optional Cabinets
The Maintenance Bypass Cabinet must be cabled and bolted to the Liebert NX before the UPS and bypass cabinet are moved into their final position. Connect the input wiring to the Maintenance Bypass Cabinet ONLY after the units are connected and positioned.
Battery cabinets may be bolted to either side of the Liebert NX; see Figure 1.
Figure 1 Cabinet arrangement—Liebert® NX™ units and battery cabinets
Liebert | Battery | |
NX | ||
Cabinet | ||
UPS | ||
|
Front of Units
Battery | Battery | Battery | Liebert | |
NX | ||||
Cabinet | Cabinet | Cabinet | ||
UPS | ||||
|
|
|
Battery | Liebert | |
NX | ||
Cabinet | ||
UPS | ||
|
Front of Units
Liebert | Battery | Battery | Battery | |
NX | ||||
Cabinet | Cabinet | Cabinet | ||
UPS | ||||
|
|
|
Front of Units | Front of Units |
Battery Cabinet
Liebert
NX
UPS
Battery Cabinet
Liebert
NX
UPS
Liebert
NX
UPS
Battery Cabinet
Liebert
NX
UPS
Battery Cabinet
Front of Units
11