Installation Drawings

Figure 40 Liebert® NX160-200kVA UPS to 49" battery cabinet interconnection

C

A D

NX 160-200KVA UPS Module

Front View

A

CBB

D CD

49" Battery Cabinet Right-Side Views

NOTES:

1.All cables must be repositioned prior to and while setting the cabinets in their installed location.

2.Refer to the individual drawing of each piece of equipment for additional details.

Run

From

To

Conductors

 

 

 

 

A

UPS Battery Terminal Block

External Battery Cabinet

Positive, Negative

 

 

 

 

B

External Battery Cabinet

Additional External

Positive, Negative

Battery Cabinet(s)

 

 

 

C

Battery Cabinet(s) Breaker

UPS Monitoring Board

Battery Breaker

Control Terminal Block

Auxiliary Contacts

 

 

D

UPS Ground

Battery Cabinets Ground

Ground

 

 

 

 

66

Page 76
Image 76
Emerson 40-200KVA user manual Cbb