Installation Drawings

Figure 48 Interconnecting details for Liebert® NX40-120kVA UPS to paralleling cabinet with input, bypass and distribution circuit breakers

A

B1-B4

FRONT

Without Covers

D

G1-G4,

H1-H4

E1-E4, F

 

G1-G4,

 

H1-H4

 

B1-B4

C1-C4

E1-E4

FRONT

 

With Door Open

C1-C4

REAR

Without Covers

Run

From

To

Conductors

 

 

 

 

A

Utility Source

Parallel Cabinet

Ph A, B, C - System Input

 

 

 

 

B1-B4

Parallel Cabinet

UPS #1-UPS #4 Module

Ph A, B, C - UPS Inputs

AC Input

 

 

 

C1-C4

UPS #1-UPS #4 Module

Parallel Cabinet

Ph A, B, C - UPS Outputs

AC Output

 

 

 

D

Parallel Cabinet

Critical Loads

Ph A, B, C - System Outputs

 

 

 

 

E1-E4

Parallel Cabinet

UPS #1-UPS #4 Module

Ground - UPS

Gnd

 

 

 

F

Parallel Cabinet

Building Gnd

Ground - System

 

 

 

 

G1-G4

Parallel Cabinet

UPS #1-UPS #4 Module

Output Breaker Aux Contact

UPS Parallel Logic Board (M3)

 

 

 

H1-H4

Parallel Cabinet

UPS #1-UPS #4 Module

UPS Bypass Detection

UPS Parallel Logic Board (M3)

 

 

 

74

Page 84
Image 84
Emerson 40-200KVA user manual Front