Liebert® BDC™
7.4.3Input/Output Wiring
Follow the steps below to connect the input wiring:
NOTE
Input wiring must be installed using conduit if cabinet is not mounted to the immediate right of the UPS.
1.Locate the input wiring access (top or bottom access), remove the conduit landing plate and punch the appropriate size hole for the size conduit being used. Pull the three/four input wires through it, allowing some slack for installation. For cabinets that are located to the immediate left of the UPS, the access plate is on the lower right of the cabinet. Remove the access plate and verify that the edge guarding is installed and intact.
2.Secure the conduit to the access plate of the Liebert BDC.
3.Input power cables connect to the system input circuit breaker; refer to Figure 21 and Table 34.
4.Connect the ground (earth) wire to the earth busbar and tighten it to
5.Locate UPS input and output cables and access panel to UPS on lower right side.
NOTE
If the Liebert BDC is not to be bolted to the UPS, use either top or bottom access plate.
6.Connect the system ground cable between the Liebert BDC and UPS and tighten the connections to
7.Connect the system input cables between the Liebert BDC “UPS Input” Busbars
8.Connect the system output cables between the Liebert BDC 'UPS Output' Busbars
NOTICE
Risk of improper wiring connection. Can cause equipment damage.
The control wire must be installed to ensure proper operation of the system and fully protect the load when switching between bypass cabinet and UPS.
43