2.4 Preliminary Checks

8

Chapter 2 Mechanical Installation

2.4 Preliminary Checks

Before you install the UPS hardware you should carry out the following preliminary checks:

1.Verify that the UPS room satisfies the environmental conditions stipulated in the equipment specification, paying particular attention to the ambient temperature, air exchange system, and dust density.

2.Remove any packaging debris, visually examine the UPS and battery equipment for transit damage, both internally and externally. Report any such damage to the shipper immediately.

2.5Installation Drawings

The following drawings illustrate the key mechanical characteristics of the various UPS system cabinets.

1905

Front view

Air inlet

1251

Removable grille for lifting with fork-lift truck (1 pcs in 1201*116, 2 pcs in 484*102)

Top view

Air

outlet

Side view

87

3

Back view

Removable grille - if using side cable entry (2 pcs in 628*102)

Removable grille for lifting with fork-lift truck (1 pcs in 1201*116, 2 pcs in 484*102)

Figure 2-1 Front, side, top, back views of 160kVA/200kVA UPS (6-pulse rectifier) (unit in mm)

HIPULSE U UPS Single Module And “1+N” (Expandable) 160/200/300/400kVA User Manual