Chapter 3 Electrical Installation

24

Chapter 3 Electrical Installation

 

 

 

 

Table 3-8 Description of auxiliary terminal block X3

 

 

 

 

 

X3 terminal reference

Reference label

Description

 

 

1

FB

BCB normally open auxiliary contact

 

 

2

GND

Signal ground

 

 

3

OL

Cable detection

 

 

4

+12V

Power positive

 

 

5

TMP_T

Temperature sensing terminal

 

 

6

GND

Temperature sensing signal ground

 

 

7

LM355+

LM335 detection positive

 

 

8

LM355+GND

LM335 signal ground

 

 

9

DRV

BCB drive

 

 

10

DRV_GND

Drive ground

 

Note:

 

 

 

1.

The auxiliary cables of the battery must be screened and double insulated.

 

2.

The screen is connected to the earth of the battery cabinet or supporting rack.

 

3.

Use multiple-core shielded cables with a section of 0.5 to 1 mm2.

 

4.

Connect the cables with the fast-on 6.3*0.8 mm terminals (female)

Connect the BCB control and temperature compensation cables between the UPS auxiliary terminal block X3 and BCB control board. For details, refer to Figure 6-5. These cable must be shielded, shield should be connected at protective earth of battery cabinet or battery breaker, not of UPS.

3.4 Connecting Main Cabinet And Side Cabinet Note

If battery temperature compensation is needed, this function must be activated by the commissioning engineer.

3.4 Connecting Main Cabinet And Side Cabinet

The 300kVA UPS (12-pulse rectifier) and 400kVA UPS comprise a main cabinet and a side cabinet.. In installation, you need to make electrical connection between the main cabinet and side cabinet.

3.4.1 Connecting Power Cables

The power cable connections between the main cabinet and side cabinet of the 300kVA UPS (12-pulse rectifier) and 400kVA UPS are shown in Figure 3-9 to Figure 3-11. The installation engineer should make cable connection in strict accordance with these figures.

Main cabinet 3.4.1 Connecting Power Cables

A

Side cabinet

W4-2, W5-2, W6-2

W4-2

W5-2

W6-2

Manual backgroundNut M10

Spring w asher 10

Plain w asher 10

Bolt M10 *35

A amplified view

Figure 3-9 Power cable connection between main cabinet and side cabinet of 300kVA UPS (12-pulse rectifier)

HIPULSE U UPS Single Module And “1+N” (Expandable) 160/200/300/400kVA User Manual

Page 34
Image 34
Emerson 160, U/300/S/12P, 400KVA Connecting Main Cabinet And Side Cabinet, Connecting Power Cables, Electrical Installation