UL Guidelines
The following Underwriters Laboratories (UL) guidelines pertain to the installation of the matrix switcher into a rack.
•Elevated operating ambient temperature — If installed in a closed or
•Reduced air flow — Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised.
•Mechanical loading — Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mechanical loading.
•Circuit overloading — Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits might have on overcurrent protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.
•Reliable earthing (grounding) — Reliable earthing of
Mounting Instructions
1.Insert the unit into the rack, aligning the mounting bracket holes with those in the rack (see figure 108).
2.Secure the switcher to the rack using the supplied bolts.
Figure 108. Installing the Switcher in a Rack
CrossPoint and MAV Series Matrix Switchers • Reference Information 157