Switching the Blade Server ON/OFF

Preparation for Use and Operation

Other Ways to Switch ON the Basic Unit

Using the web interface of the management blade

Using the web interface of the management blade, you can switch on the basic unit as well as each of the server blades.

After power failure

The basic unit automatically switches ON following a power failure, and the server blades which were operating before the power failure are booted automatically.

Switching the Server Blades ON/OFF

The basic unit must be powered ON.

The server blade can be switched ON and OFF in the following ways:

To switch ON the server blade, press the power button of the server blade (see the manual for the relevant server blade type).

To switch OFF the server blade, press the power button of the server blade (see the manual for the relevant server blade type) for 4 seconds.

Specified switch-ON time/switch-OFF time

The server blade is switched ON or OFF at a time specified in the ServerView program.

Ring indicator

The server blade is switched ON via an external modem.

After power failure

The server blade automatically switches ON following a power failure (depending on the settings in the BIOS).

54

PRIMERGY BX600 S2 Basic Unit

Page 54
Image 54
Fujitsu BX600 S2 manual Switching the Blade Server ON/OFF, After power failure, Switching the Server Blades ON/OFF