Server Blades

Installation Sequence

7.1Installation Sequence

On the front of the PRIMERGY BX600 S2 basic unit are ten slots for server blades (numbered 1 - 10 from left to right).

1

2

3

4

5

6

7

8

9

10

Figure 30: BX600 S2 basic unit with ten 2-way server blades

All ten slots are connected to the infrastructure modules on the back of the BX600 S2 basic unit via the midplane of the BX600 S2 basic unit:

Switch blade(s)

Fibre Channel pass-thru blade(s) (optional)

Ethernet pass-thru blade(s) (optional)

Management blade(s)

KVM blade

Power supply units

VCAUTION!

PRIMERGY BX620 S4 server blades are not for use in slots 4 an 10 of the PRIMERGY BX600 S2 basic unit.

In a PRIMERGY BX600 S2 basic unit different models and configurations of server blades can be operated alongside each other.

PRIMERGY BX600 S2 Basic Unit

73

Page 73
Image 73
Fujitsu BX600 S2 manual Installation Sequence, Server Blades