Click Save at the bottom of the page. You must restart the Management Module to implement the changes.
6.1.3 I/O module management tasks
In this section, we set up and configure the Nortel Networks Layer 2/3 Copper Gigabit Ethernet Switch Module for IBM Eserver BladeCenter.
Nortel Networks L2/3 GbESM setup and configuration
You can install the Nortel Networks L2/3 GbESM into any of the four BladeCenter switch bays in the rear of the chassis. Bay 1 is attached to one of the Ethernet Network Interfaces Controllers (NIC) on the blade HS20. Bay 2 is attached to the other Ethernet NIC. Each NIC is a Gigabit Full Duplex link to only one of the switches. As for HS40, which has a total of four NICs as standard, each two NICs link to one switch. A switch in bay 3 or bay 4 is required when a Gigabit Ethernet Expansion Card is being installed on the blade. This card provides an additional two NICs to the blades. One of the NICs has a dedicated Gigabit Full Duplex link to bay 3 and the other NIC to bay 4.
To manage the Nortel Networks L2/3 GbESM in bay 1, from the BladeCenter Management Module, click I/O Module Tasks → Management. A window similar to the one in Figure
Figure 6-4 I/O Module Tasks: Management (Bay 1 Ethernet SM) window
As with the Management Module, the switch must have a unique IP address and be on the same subnet as the Management Module for
Click Save to apply these changes immediately. Rebooting or resetting is not required.
Chapter 6. IBM Eserver BladeCenter system initial setup 47