Nortel Networks NN44200-313 CallPilot server installation tasks, Rack-mounting the server

Models: NN44200-313

1 66
Download 66 pages 16.98 Kb
Page 41
Image 41
CallPilot server installation

41

CallPilot server installation

This task describes the CallPilot server installation.

CallPilot server installation tasks

The following is a list of tasks you perform to install the CallPilot server. To link to detailed procedures for each task, click the text.

"Rack-mounting the server" (page 41)

"Installing peripheral devices" (page 42)

"Installing cables and grounds" (page 43)

"Performing preboot checks" (page 45)

"Connecting the server to power and starting it" (page 45)

Rack-mounting the server

Perform the following procedure for four- or two-post rack-mounting.

The CallPilot server includes installation instructions for the 19” and 23” Universal Rack Mount kits. Refer to the those instructions for more details.

Step Action

1Attach the inner rail to the chassis on both sides.

2Attach the front-tab mounting bracket to the chassis on both sides. The bracket is reversible for a flush mount install.

3Using the four outer studs, assemble the mounting brackets to the outer rail. Insert the four thread covers of the 4 inner studs.

For a two-post install, flip the mounting brackets so they are facing in to each other.

Tech tip: Hand-tighten the nuts at this stage so you can adjust the distance for the server and rack.

4Install the two outer rail subassemblies.

Eight mounting screws are required for a four-post install. For a two-post install, six mounting screws are required.

Nortel CallPilot

Quickstart Guide

NN44200-313 01.02 Standard

5.019 May 2008

Copyright © 2007-2008, Nortel Networks

Page 41
Image 41
Nortel Networks NN44200-313 quick start CallPilot server installation tasks, Rack-mounting the server, Step Action