2 PREPARING FOR NETWORK CONTROL

(when optional interface board is installed)

4 Entering the operation screen

(1)The following screen will be displayed when password verification has been completed successfully.

(2)Select the language and click [OK]. The operation screen will be displayed and computer control will now be possible.

zConnection will not be possible when a menu screen is being displayed on the DVR unit or when playback- related operations are being carried out. In such a case, cancel the menu screen selection or stop the playback operation before attempting to remake connection.

zConnection may not be possible via a proxy server. In such a case, cancel the proxy settings.

NETWORK

CONTROL

94

English

Page 95
Image 95
Sanyo DSR - 300 manual Preparing for Network Control, Entering the operation screen