Table 36-1 Schedule Set Setup

FIELD

DESCRIPTION

OPTIONS

 

 

 

Day

If you selected Weekly in the How Often field above, then select the

Yes

 

day(s) when the set should activate (and recur) by going to that day(s) and

No

 

pressing [SPACE BAR] to select Yes, then press [ENTER].

N/A

Start

Enter the start time when you wish the schedule set to take effect in hour-

 

Time

minute format.

 

 

 

 

Duration

Enter the maximum length of time this connection is allowed in hour-minute

 

 

format.

 

 

 

 

Action

Forced On means that the connection is maintained whether or not there

Forced On

 

is a demand call on the line and will persist for the time period specified in

Forced Down

 

the Duration field.

 

Enable Dial-

 

Forced Down means that the connection is blocked whether or not there is

 

On-Demand

 

a demand call on the line.

 

Disable Dial-

 

Enable Dial-On-Demandmeans that this schedule permits a demand call

 

On-Demand

 

on the line.

 

 

 

Disable Dial-On-Demandmeans that this schedule prevents a demand

 

 

call on the line.

 

 

 

 

When you have completed this menu, press [ENTER] at the prompt “Press ENTER to Confirm…” to save your configuration, or press [ESC] at any time to cancel.

Once your schedule sets are configured, you must then apply them to the desired remote node(s). Enter 11 from the Main Menu and then enter the target remote node index. Press [SPACE BAR] and then [ENTER] to select PPPoE in the Encapsulation field to make the schedule sets field available as shown next.

Call Scheduling