41

Setting up auto-run

Days of week setting

5.To set the Days, press Enter to move between the fields. To

program a day, press Up/Down to select a day setting. The first character of the day will appear when selected.

The Days field is organized in the following sequence: Sunday (S), Monday (M), Tuesday (T), Wednesday (W), Thursday (T), Friday (F), Saturday (S).

For example, Figure 4-5 displays Sunday (S), Tuesday (T), Thursday (T), and Saturday (S) selected as pre-programmed run days.

6.To set Start time (S) and Duration (D) for Auto-Run #1, press Enter repeatedly to move to Time line #1. Press Up/Down arrows to change

the time and duration values. Press Enter to toggle through the fields or press left/right arrows.

7.(Skip this step if not setting auto-run #2.) To set auto-run #2, press softkey #2 until the screen displays a plus symbol in front of “2”. (This denotes it is “activated”.) Then repeat steps 5 – 6.

8.To exit the screen, press On/Off/Esc repeatedly until you return to the main screen. Press and hold the On/Off/Esc to power off.

Days field Auto-run #2 is programmed to run Monday –Thursday and Saturday

Start time and durationAuto-run #1 is programmed to run at 10:00am (“S”) for a

duration (D) of 2 hours

Start time and durationAuto-run #2 is programmed to run at 2:00pm (“S”) for a duration

(D) of 2 hours

Figure 4-4: Day of the Week (DOW) setup

9.When powered off, an Auto-run shutdown screen will appear. (Please see section, “Auto-Run shutdown screen”.)

Models SE and DL

Page 54
Image 54
3M SE, DL user manual Day of the Week DOW setup