40

Setting up auto-run

Days of week setting

NOTE: To enable Auto-run, ensure the instrument is powered off and the date and time settings were programmed for the future.

10.When powered off, an Auto-Run shutdown screen will appear. (Please see section, “Auto-Run shutdown screen”.)

Days of week setting

The Days of the Week (DOW) setting is a pre-programmed weekly auto-run with specified days, start time, duration. You can pre-program two auto-on settings with Sunday through Saturday parameters, one specific start time, and a specified duration for each auto-on setting. (See Figure 4-4 as an example for settings.)

NOTE: In order for the Days of the Week mode to autorun, ensure the instrument is in the “off” position. The meter will then automatically switch into Auto-Run based on your setup.

Days of Week (Auto-Run) setting To program Auto-On 1, first select the days of the week, then specify a start time for your test with a duration (to end your test).

Figure 4-3: Example of setting up Auto-Run (QSP-II)

A study run under the DOW mode wakes up the instrument from a powered down condition, runs the study, saves it, then powers the instrument down again. The cycle repeats for the next time and day in the setup, and for the other Auto-on 2 if that is also activated in the mode.

Setting the Date of Week (DOW)

1. From the start screen, press Up/Down

to highlight Setup and

press Enter

.

 

2.Select Auto-Runby using Up/Down to highlight and press Enter to select.

3.In the Auto-Run screen, repeatedly press Enter until DOW appears.

4.Press the Down arrow to select View/Set Parameters and press Enter .

Models SE and DL

Page 53
Image 53
3M DL, SE user manual Days of week setting,  Setting the Date of Week DOW