Installation

Installation of an NXD-500i Touch Panel

The NXD-500i can be installed either directly into the (optional) CB-TP5i Rough-In Box or other solid surface environment, using solid surface screws or the included locking tabs as mounting options. The following sections describe mounting the touch panel directly into a pre-wall rough-in box, a solid surface, drywall, or an NXA-RK5 Rack Mount Kit.

Pre-Wall Installation of the Rough-In Box

The CB-TP5i Rough-In Box (FG038-11) is an optional metallic box that is secured onto a stud/beam in a pre-wallsetting, where no walls are present. Installation procedures and configurations can vary, depending on the installation environment. This section describes the installation procedures for the most common installation scenarios.

In order to guarantee a stable installation of the NXD-500i, the distance between the CB-TP5i and the outer wall surface must be a minimum of .50 inches (1.27cm) and a maximum of .875 inches (2.22cm).

Cutting out the surface slightly smaller than what is outlined in the installation drawings, to allow any necessary cutout adjustments, is highly recommended.

1.Attach the optional Back Cover for the CB-TP5i (FG038-12) if necessary.

2.Fasten the CB-TP5i Rough-In Box to the stud through the holes on the Stud Mounting tabs (FIG. 5), using either nails or screws.

Stud

Stud Mounting tabs

Wiring knockouts

FIG. 5 CB-TP5i Rough-In Box components

3.Remove the appropriate wiring knockouts from the rough-in box (FIG. 5) to accommodate the cables being threaded through to the NXD-500i touch panel.

4.Thread the incoming Ethernet and USB wiring through the knockouts. Use of the left wiring knockouts are recommended with this installation. Leave enough slack in the wiring to accommodate any re-positioning of the panel.

NXD-500i 5" Wall/Flush Mount Touch Panel with Intercom