Manuals
/
Avaya
/
Communications
/
Telephone
Avaya
03-300686
manual
Port Assignment Record Form
Models:
03-300686
1
53
156
156
Download
156 pages
34.05 Kb
50
51
52
53
54
55
56
57
<
>
Install
LED indicators
Wiring telephones and trunks
System Configuration
Procedures ZD8AJ adapter
How to
Testing port network equipment
Safety
Auxiliary power
Test type Test features
Page 53
Image 53
Completing a provisioning plan
Figure 25: Port Assignment Record Form
Issue 3 January 2008 53
Page 52
Page 54
Page 53
Image 53
Page 52
Page 54
Contents
Installing and Connecting the MDF and Telephones
Avaya Inc All Rights Reserved
Installing the patch panel
Installing and wiring telephones and trunks
Installing and wiring telephone power supplies 109
Testing the complete configuration 135
Index 151
Contents Installing and Connecting the MDF and Telephones
Audience
How to use this documentation
Downloading this book and updates from the Web
Sending us comments
Related resources
Introduction
Physical requirements and layout
Installation space requirements
Cable Slack Manager
Installation layout
Sizing 4-pair station cables
Main distribution frame cross-connect fields
Example MDF connections MCC1 Media Gateway
Main distribution frame hardware installation
Example MDF connections G650 Media Gateway
WER
Main distribution frame placement
Main distribution frame labels
Label graphic symbols and nomenclature
Mounting 110A- or 110P-type terminal blocks on the wall
110A-type terminal blocks 300-pair
110P-type terminal blocks 900-pair
1110A2 and 1110C1 apparatus mountings
Mounting 110P-type terminal blocks on a frame
Installing Cable Slack Managers
Cbdfflr CJL
R758155 CJL
Page
Cross-connecting the media gateway to the patch panels
Installing patch panels
Typical RMC patch panel installation
Sample cross-connect field patch panel connections
Page
Equipment room cabling labels
Media gateway connections to the MDF
Equipment room cabling labels
Self-stick label on 25-pair cable connector
Cable routing to top terminal blocks
Cable routing guidelines
Cable routing to bottom terminal blocks
Installing cables between media gateway and MDF
MDF
Installing connector cables between auxiliary cabinet
Page
Information outlets
Station telephone wiring design
Station cables
Satellite locations
Closets
Site locations
Station circuit distribution from equipment room
Pair to 4-pair station circuit distribution
Pair station circuits
Pair circuit distribution and connectivity
Pair run to equipment room or satellite location
Pair to 4-pair satellite location connectivity
Pair to 4-pair circuit distribution and connectivity
258A and BR2580A Adapters
Connected cable station adapters
356A Adapter
Completing a provisioning plan
Port Assignment Record Form
Installing sneak current and off premise protection
Model 507B sneak fuse panel
Installing and Connecting the MDF and Telephones
Installing sneak fuse panels
Installing coupled bonding conductor wires
Installing the coupled bonding conductor
Typical power and ground for a DC power cabinet
Installing and Connecting the MDF and Telephones
Coupled Bonding Conductor
Installing and administering the patch cord/jumper
Example 3-pair labeling to information outlet
Example 4-pair labeling to information outlet
Connecting trunk pairs using concentrator cables
Connect trunk pairs using concentrator cables
Pair modularity for trunk pairs for 1-pair trunks
Pair modularity for trunk pairs for 3-pair Tie trunks
Wiring telephones and trunks
Installing and wiring telephones and trunks
Connectable telephones and consoles
Connecting telephones
IP Dect
Installing and wiring telephones and trunks
Connecting a typical telephone
302D to 4-wire DCP wiring
Connecting adjunct power
400B2 Adapter connecting to a modular plug
Connecting an analog station or 2-wire digital station
Analog tie trunk example
2500-type analog telephone wiring
Digital tie trunk example
Analog Tie Trunk wiring
Collocated DS1 interface trunks
DS1 tie trunk example
Typical connections to channel service unit
DS1 interface trunks using T1 channel service unit
DS1 cables Connector cable Description and usage
BL-W
GRD
Inads Tip
Pair and 4-pair modularity
Three-pair and four-pair modularity
Example adjunct power connections
Adjunct power connection locations
Attendant console example
Auxiliary power
Installing the attendant console
Hard-wire bridging
Dual wiring of 2-wire and 4-wire endpoints
Installing the 26B1 Selector Console
Connecting external alarm indicators and auxiliary power
Sample Issue 1 IPSI-2 alarm cable connectivity
Installing off-premises station wiring
Off-premises connections
Off-premises or out-of-building stations
Connections for 1 to 8 out-of-building analog telephones
Connections to 24 out-of-building telephones
Off-premises protection requirements
Digital Out-of-Building Telephone Protection
Telephone restrictions for exposed environments
Installing the ITW Linx Enhanced Protector
Connections at trunk/auxiliary field
Emergency transfer units and associated telephones
Issue 3 January 2008
808A Emergency Transfer Panel
808A Emergency Transfer Panel mounting
Installing the 808A Emergency Transfer Panel
Installing and wiring telephones and trunks
Trunk/test switches
TLC2
Connections for telephone used for emergency transfer
R758582b LAO
Issue 3 January 2008
Installing external ringing
Installing the queue warning indicator
Page
1145B2 power supply
Installing and wiring telephone power supplies
Important warning for 1145B2 power supply
Mounting the 1145B2/1146B2 power supply
1145B2/1146B2 mounting arrangement
Expanded power distribution unit
Mounting the 1146B2 Power Distribution Unit
Installing the wall-mounting plates
Installing the expanded power distribution unit
Installing the battery mounting/wiring
LED
Powering up and testing the power supply
Typical wiring to a telephone on
Wiring the 1146B2 Power Distribution Unit
Typical wiring to a telephone
Resetting LEDs on power distribution unit
Important safety instructions
1152A1 Mid-Span Power Distribution Unit
Connecting the 1152A1 Power Distribution Unit
Using the 1152A1 Power Distribution Unit
Connecting the cables
Connecting cables to telephones and other end devices
Snmp
1152B Mid-Span Power Distribution Units
Important 1152B PDU Safety Instructions
Connecting the 1152B PDU cables
Using the 1152B PDUs
Connecting telephones and other end devices to the 1152B PDU
Connecting cables to telephones and other end devices
To connect telephones and other end devices to the 1152B PDU
C360 switch important safety instructions
C360 converged stackable switches
Using the C360 switch
Powering up-AC input
Connecting the C360 stackable switches
Connecting the cables
1151B1 and 1151B2 Power Supplies
Using 1151B1 and 1151B2 Power Supplies
1151B2 Power Supply front
Connecting the 1151B1 or 1151B2 Power Supplies
Page
Testing the complete configuration
Checking port network status for each media gateway
Testing port network equipment
Testing port network equipment
Checking circuit pack configuration
System Configuration
Testing Expansion Interface circuit packs, if used
Testing time division multiplexing bus for each port network
Sample of port network status before expansion link is set
Sample of port network status after expansion link is set
Testing telephones and other equipment
Making test calls
Testing 302C attendant console
Testing external ringing
Testing selector console
Testing queue warning indicator
Testing integrated announcement
Testing emergency transfer Avaya S8700 Multi-Connect only
Testing music-on-hold
Test type Test features
Testing terminating trunk transmission
Testing connectivity to the LAN
LED indicators
DS1 Converter circuit pack LEDs
Telephone console LEDs
TN1654 DS1 Converter circuit pack LEDs
Span LEDs
Index
Labels Provisioning plan Cabling layout Calling queue 107
MDF
TN2312AP/BP
Procedures ZD8AJ adapter
Index Installing and Connecting the MDF and Telephones
Top
Page
Image
Contents