Contents |
|
Site locations | 44 |
Station circuit distribution from equipment room | 44 |
45 | |
45 | |
Connected cable station adapters | 50 |
Completing a provisioning plan | 52 |
Installing sneak current and off premise protection | 54 |
Installing sneak fuse panels | 57 |
Installing the coupled bonding conductor | 58 |
Installing coupled bonding conductor wires | 58 |
Installing and administering the patch cord/jumper | 62 |
Labeling expansion control carrier cable | 64 |
(MCC1 Media Gateway only) | |
Connecting expansion control carrier outputs | 65 |
cable (MCC1 Media Gateway only) | |
Connecting trunk pairs using concentrator cables | 65 |
Connecting trunk pairs to media gateway | 67 |
using jumper wires to establish | |
Chapter 6: Installing and wiring telephones and trunks | 69 |
Wiring telephones and trunks | 69 |
Connecting telephones | 70 |
Connectable telephones and consoles | 70 |
Connecting a typical telephone | 73 |
Connecting adjunct power | 74 |
Connecting an analog station or | 75 |
Analog tie trunk example | 76 |
Digital tie trunk example | 77 |
DS1 tie trunk example | 78 |
Collocated DS1 interface trunks | 78 |
DS1 interface trunks using T1 channel service unit | 79 |
Auxiliary connector outputs (MCC1 and SCC1 | 81 |
Media Gateways only) | |
84 | |
Adjunct power connection locations | 85 |
Attendant console example | 86 |
Attendant console cabling distances, local | 86 |
and phantom power | |
Auxiliary power | 86 |
87 |
4 Installing and Connecting the MDF and Telephones