MDF connections to stations and the public switched telephone network

Completing a provisioning plan

A provisioning plan should be completed before an installation. The plan determines an appropriate available port circuit on the media gateway for each telephone, trunk, and peripheral connection needed, and any auxiliary power for Basic Rate Interface (BRI) and certain display sets.

Obtain copies of the Port Assignment Record forms (or equivalent) from the customer or marketing representative. See Figure 25: Port Assignment Record Form on page 53 for an example of the form. These forms contain the port assignments and identify the extension numbers (terminal number) of the telephones. Enter the jack assignments at the equipment room.

The Port Assignment Record should have the following information:

Station or trunk type or feature/service

Building location (floor/room/desk/outlet)

Extension number or trunk group and member number

Port circuit location on the media gateway for each endpoint (media gateway/slot/circuit)

Route from equipment room through site/satellite closets to each endpoint

Auxiliary power supply, if required (main distribution frame (MDF), site/satellite closet, or information outlet)

52 Installing and Connecting the MDF and Telephones

Page 52
Image 52
Avaya 03-300686 manual Completing a provisioning plan