Installing the main distribution frame

Cable clamps are required in installations with cable slack managers. At the rear of the media gateways, install two cable clamps using the screws provided. These clamps hold the 25-pair input/output or MDF cables in place. Figure 8: Cable routing through Cable Slack Manager—example for MCC1 Media Gateway on page 26 and Figure 9: Cable routing through Cable Slack Manager—example for SCC1 Media Gateway on page 27 show cable clamp placement and cable routing.

Figure 8: Cable routing through Cable Slack Manager—example for MCC1 Media Gateway

cbdfflr CJL 102396

Figure notes:

 

 

1.

Top of Media Gateway

4.

Spare Center Troughs

2.

Cable Slack Manager

5.

Media Gateway Trough for

3.

Cable Clamp

 

Port Cables

 

 

 

 

26 Installing and Connecting the MDF and Telephones

Page 26
Image 26
Avaya 03-300686 manual Cbdfflr CJL