
Installing the main distribution frame
Cable clamps are required in installations with cable slack managers. At the rear of the media gateways, install two cable clamps using the screws provided. These clamps hold the
Figure 8: Cable routing through Cable Slack Manager—example for MCC1 Media Gateway
cbdfflr CJL 102396
Figure notes: |
|
| |
1. | Top of Media Gateway | 4. | Spare Center Troughs |
2. | Cable Slack Manager | 5. | Media Gateway Trough for |
3. | Cable Clamp |
| Port Cables |
|
|
|
|