Installing the main distribution frame
11.If installing another distribution field terminal block, partially install the first screw for the terminal block, on the line,
12.If installing a vertical patch cord trough in the distribution field, repeat Step 6.
13.Repeat Steps 11 and 12 until all the terminal blocks and vertical patch cord troughs in the distribution field are installed.
Figure 5: 110A-type terminal blocks (300-pair)
r758420b MMR 031496
Figure notes: |
|
| |
1. | 4 feet (1.22 meters) | 6. | 47.5 inches (120.6 |
2. | 6.6 feet (2 meters) |
| centimeters) |
3. | 7.68 inches (19.5 centimeters) | 7. | Horizontal Line |
4. |
| 8. | AC Power Strip |
5. | 5.31 inches (13.5 centimeters) | 9. | Floor Line |
|
|
|
|