Baldor GLC30, GLC60, GLC105, GLC45, GLC20, GLC65, GLC100, GLC15 Post Installation Checks Continued

Models: GLC40 GLC25 GLC15 GLC100 GLC30 GLC65 GLC20 GLC45 GLC105 GLC60 GLC10

1 114
Download 114 pages 7.44 Kb
Page 39
Image 39

Post Installation Checks Continued

22.With the engine running, several checks must be made:

a.Verify there are no fuel leaks. If a fuel leak is detected, stop the engine immediately (move the Master Control Switch to the “Stop” position) and repair the leak before proceeding.

b.Verify there are no coolant or oil leaks. If a leak is detected, stop the engine immediately and repair the leak before proceeding.

c.Verify that operation is smooth. If belt squeals, vibrations or other sources of noise exist, stop the engine immediately and repair before proceeding.

d.Verify that the correct voltage exists (line-to-line and line-to-neutral) at the generator and at the transfer switch.

e.Minor adjustment of the output voltage is made using the “Voltage Adjust” potentiometer on the control panel.

WARNING: Engine coolant is under pressure and is near the boiling point of water when engine is hot. Do not open the coolant system until the engine has completely cooled. Hot coolant can cause severe burns and other injuries. When engine is cool, coolant level can be checked.

23.After the operation checks are made, stop the engine (move the Master Control Switch to the “Stop” position) and wait at least 2 hours for the engine to cool. When the engine is cool, check engine oil and coolant levels as instructed in the engine operation manual.

24.Close all enclosure covers. The post installation checks are now complete.

MN2408

Receiving & Installation 3‐15

Page 39
Image 39
Baldor GLC30, GLC60, GLC105, GLC45, GLC20, GLC65, GLC100, GLC15, GLC25, GLC40 manual Post Installation Checks Continued