Chapter 3 Installing the Cisco ADE 2130 and 2140 Series Appliance

Powering Up the Cisco ADE 2130 and 2140 Series Appliance

Powering Up the Cisco ADE 2130 and 2140 Series Appliance

Warning Do not touch the power supply when the power cord is connected. For systems with a power switch, line voltages are present within the power supply even when the power switch is off and the power cord is connected. For systems without a power switch, line voltages are present within the power supply when the power cord is connected. Statement 4

Warning This equipment is intended to be grounded. Ensure that the host is connected to earth ground during normal use. Statement 39

This section explains how to power up the appliance. Depending on whether your appliance has AC or DC power supplies, see the appropriate section:

Power-Up Procedure (AC Power Supply), page 3-20

Power-Up Procedure (DC Power Supply), page 3-21

Warning Never install an AC power module and a DC power module in the same chassis. Statement 1050

Power-Up Procedure (AC Power Supply)

To power up a Cisco ADE 2130 and 2140 Series appliance with an AC power supply and verify its initialization and self-test, follow this procedure. When the procedure is finished, the appliance is ready to configure.

Step 1 Review the information in the “Safety Guidelines” section on page 2-2.

Step 2 Before proceeding, if the AC power cord is connected directly into the AC power outlet and because the AC power cord provides its own ground conductor, you only need to ensure that the rack has been properly grounded. (See the “Connecting the Appliance AC Power” section on page 3-12for more information.)

Step 3 Plug the AC power cord into the power cord receptacle at the rear of the appliance. (See location 1 in Figure 1-5 on page 1-9.)

Step 4 Connect the other end of the power cord to a power source at your installation site. Step 5 If there is a second AC power supply, repeat Steps 3 and 4 for the second power supply.

Step 6 Press the power button on the front of the appliance. (See location 9 in Figure 3-13 on page 3-21.)

The appliance should begin its powerup procedure.

Step 7 After the operating system boots up, observe the front-panel LEDs to verify that your system is operating

properly. (See Figure 3-13 on page 3-21and the “Checking the LEDs” section on page 3-21.)

Once the operating system boots, you are ready to initialize the basic software configuration. (See the software installation guide or user guide that shipped with your appliance for proper configuration procedures.)

Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide

3-20

78-18579-02

 

 

Page 70
Image 70
Cisco Systems manual Powering Up the Cisco ADE 2130 and 2140 Series Appliance, Power-Up Procedure AC Power Supply