Numerics

2-post hardware kit rack-mount 3-4

2-post rack, mid-mounting appliance on 3-54-post hardware kit

rack-mount 3-7

4-post rack, mounting appliance on 3-7

A

AC power up procedure 3-20

adapter cards troubleshooting A-4

adapter pinouts 1-14

ADE 2130 and 2140 Series appliance front view 1-6

rear view 1-8

ADE 2130 Series appliance configuration 1-4

ADE 2140 Series appliance configuration 1-5

air duct, processor removing 4-7

airflow guidelines 2-9

altitude guidelines C-4

appliance cover installing 4-20removing 4-3

auxiliary port

I N D E X

pinouts 1-14

B

back panel 1-9,3-15,3-17

blank (power supply) filler panel, removing 4-20

C

cable

 

 

 

 

 

management

3-19

 

checking

 

 

 

 

 

LEDs

3-21

 

 

 

checklist, installation

2-15

 

configuration

 

 

 

 

ADE 2130 Series appliance

1-4

ADE 2140 Series appliance

1-5

site 2-8

 

 

 

 

connecting

 

 

 

 

 

network and console cables

3-18

network interface

3-18

 

connections

 

 

 

 

 

console port

2-16

 

Ethernet

2-16

 

 

troubleshooting

A-4

 

considerations

 

 

 

 

power

2-10

 

 

 

console port

 

 

 

 

 

connections

2-16

 

 

pinouts

 

 

 

 

 

serial

1-13

 

 

serial

1-12

 

 

 

console port signaling cabling, DB-9 (table) 1-14

Cisco Application Deployment Engine (ADE) 2130 and 2140 Series Appliance Hardware Installation Guide

 

78-18579-02

IN-1

 

Page 111
Image 111
Cisco Systems 2140, 2130 manual Numerics