Table of Contents

F - 160 CE Operation and Maintenance Manual

 

 

Section 5: Operations

5.1

Control panel

5 - 1

 

Figure 5.1.1

Front control panel

.................................................

5 - 9

5.2

Emergency

5

- 10

5.2.1 In an emergency

5

- 10

5.2.2 Resume operation

5 - 11

5.3

Set up

5

- 12

5.3.1 Power

5

- 12

5.3.2 Film loading

5

- 12

 

Chart 5.3.1 Measurement chart

5

- 14

5.3.5 Heating

5

- 14

5.4

Job programming

5

- 16

 

Chart 5.4.1

Job save chart

5

- 17

5.5

Manual nip adjustment

5

- 18

5.5.1 Main roller manual nip adjustment

5

- 18

Page IV

© GBC Films Group April 2000

Page 5
Image 5
GBC F - 160 CE manual Operations, Front control panel, Chart