4.7Installing levelers

Leveling of the machine is a customer option. If you choose not to level the laminator and you encounter output problems, please level the machine and try your application again before calling for technical support.

Before leveling can be performed, the castors must be replaced with leveling bolts and leveling pads.

b)Lock the castors on the drive side leg.

CAUTION

Do not lift the machine where NO LIFT warnings are located. You can cause damage to the electrical bridge.

c)Slide the floor jack under the control side leg.

Tools required

Torpedo level

( 2 ) 3/4” open end wrenches

Four leveling pads

( from the accessory pack )

• Four Leveling bolts

( from the accessory pack )

• Twelve 3/4 - 10 nuts

( from the accessory pack )

• Floor jack

( 600 pound rating )

• Second person

Control side

a)Verify that the laminator has sufficient room around it to load film, walk around and to be serviced if necessary.

Center of the leg

d)Raise the control side approximately 4 in. from the bottom of the castor to the floor. (10 cm) Must have eneough clearance to remove the castors