
F - 160 CE Operation and Maintenance Manual | Maintenance |
|
|
Section 8 Maintenance | 8.1 Maintenance Schedule |
GBC Films Group laminators require minimal maintenance. However, regular maintenance is essential to keep any piece of precision machinery at peak performance. A maintenance schedule and a section of procedures are included in this section.
W A R N I N G
Do not wear ties, loose fit clothing or dangling jewelry while operating or servicing the laminator. These items can get caught in the nip and choke you or you can be crushed or burned.
I N F O R M A T I O N
Below is a recommended maintenance
schedule. Before performing any of the steps
listed, read through the procedures first. Please follow the instructions pertaining to the step you are performing.
Daily
• Clean the rollers
( See cleaning in this section )
• Inspect the electrical cord for damage.
( If damaged, you should replace or repair it immediately )
• Inspect the footswitch cord for damage.
( If damaged, you should replace or repair it immediately )
I N F O R M A T I O N
Improper maintenance, can result in poor output quality.
ELECTRICAL
S H O C K
Remove power from the laminator before servicing. You can be severely shocked, electrocuted or cause a fire.
Monthly
• Adjust the nip if needed.
( performed by service technician )
• Check the chain tension.
( performed by service technician )
•Inspect the area around the laminator for possible hazards
( dust buildup, combustible items stored too close, etc. )
© GBC Films Group April 2000 | Page 8 - 1 |