Neutral CT Primary and Secondary

Communications

Baud Rate for Comm 1, 2, and 3.

Unit ID for Comm 1, 2, and 3.

Protocol for Comm 1, 2, and 3.

Mode for Comm 1.

IP Address, Subnet Mask, and Default Gateway.

The Setup 1 tab also provides push buttons for performing the following commands:

Download – Executes a script to check for values that have changed and downloads those values to the device via the GE 7700 Gateway.

Refresh – Executes a script to upload all of the meter values for the settings on the screen.

Note: Be sure to click the Refresh button prior to changing or downloading any settings to the EPM7500 or EPM7600, as the latest settings may not be displayed.

137

Page 145
Image 145
GE GEH-6513, EPM5200P, EPM9450Q, EPM 7300, EPM 7700, PMCS 6.11a, EPM9650Q manual Communications