9.5Replacing Meter Body Center Section, Continued

Procedure, continued

Table 29 Replacing Meter Body Center Section, Continued

Step

4

5

6

7

8

Action

Remove nuts from bolts that hold process heads to center section. Remove process heads and bolts

Remove O-ring and clean interior of process head using soft bristle brush and suitable solvent.

Replace O-ring.

Coat threads on process head bolts with anti-seize compound such as “Neverseize” or equivalent.

Carefully assemble process heads and bolts to new center section. Finger tighten nuts.

Nuts

O-ring

Flex-Tape Assembly

O-ring

Bolts

Process head

Center section

Process head

22370

Continued on next page