Tools Required

The following tools are required to unpack and install the system:

Standard hand tools, such as a adjustable-end wrench

ESD grounding strap

Digital voltmeter capable of reading ac and dc voltages

1/2-inch socket wrench

9/16-inch wrench

#2 Phillips screwdriver

Flathead screwdriver

Wire cutters or utility knife

Safety goggles or glasses

T-10, T-15, T-20, T-25, and T-30 Torx drivers

9-pin to 25-pin serial cable (HP part number 24542G)

9-pin to 9-pin null modem cable

Unpacking the Cabinet

WARNING! Use three people to unpack the cabinet safely.

HP recommends removing the cardboard shipping container before moving the cabinet into the computer room.

NOTE: If unpacking the cabinet in the computer room, be sure to position it so that it can be moved into its final position easily. Notice that the front of the cabinet (Figure 3-3) is the side with the label showing how to align the ramps.

To unpack the cabinet, follow these steps:

Unpacking and Inspecting the System

63

Page 63
Image 63
HP Integrity Superdome and 9000 Superdome sx2000 manual Tools Required, Unpacking the Cabinet