4. Press the Power On switch.

5.Check your display or ASCII terminal for configuration information displayed as thepower-onself-test (POST)begins. The system beeps once to indicate it is working properly.

If no operating system is installed, you are prompted to select the operatin system installation device.

Chapter 1. System Startup1-7

Page 25
Image 25
IBM RS/6000 7025 manual System Startup1-7