Testing the Setup

The following is a sample procedure to assure your setup is working.

These tests include communicating with the server operating system. Be sure the necessary serial port(s) is configured. If you need assistance, refer to “Serial Port Configuration” on page C-3.

The server should be powered off as a result of the “Service Processor Setup Checklist” on page C-1.

Call-In:

1.Go to your remote terminal and call-in to your server. Your server should answer and offer you the Service Processor Main Menu after requesting your privileged access password.

2.Enter itemSystem2, Power Control Menu.

3.Enter itemPower4,-On System.

Answer "y" when asked if you wish to continue powering on the system.

4. After

the

system

firmware

and operating system have

initialized

the

server, the

login

prompt should appear at your remote terminal if you set

up

seamless

modem

transfer (refer to page D-6 for more information). This may

take several

minutes. When this occurs, you have successfully called into the Service

Processor.

 

 

 

 

 

 

 

 

5. Typelogout

to disconnect from

the

operating system. The

message

"No

 

 

Carrier"

displays

on your remote

terminal.

 

 

 

 

6. Call

your server again. The operating system should answer and

offer

you the

login

prompt.

 

 

 

 

 

 

 

If these tests are successful, call-in is working.

7. Login in and command your server to shutdown and power off. (The AIX command shutdown -Fwill do this.)

8. The message "No Carrier" displays on your remote terminal.

Call-Out:

During the setup, you entered your phone number for the Pager (on page 4-19) and Customer Voice (on page 4-20) phone numbers. These numbers are used for this test.

1. Your remote terminal should be disconnected as a result of the Call-In test.

C-2IBM RS/6000 7025 F50 Series User's Guide

Page 324
Image 324
IBM RS/6000 7025 manual Testing the Setup, Call-In, Call-Out