
Figure 27. Fibre Channel Switch Module Locations
4.If the blade server is operating, press the
5.Open the two release levers. The blade server moves out of the bay approximately 0.6 cm (0.25 inch).
6.Pull the blade server out of the blade bay.
7.Place either a filler blade or another blade server in the bay within 1 minute. The recessed
✏NOTE
The installation procedure in this manual is applicable to the Intel® Server Compute Blade SBXL52 and should be used as a reference. When installing the FC Expansion Card in other Intel® Server Compute Blades, refer to the Installation and User’s Guide for that product.
8.Lay the blade server down on a flat, nonconductive surface, with the cover side up.
9.Press the
Hazardous energy is present when the blade is connected to the power source. Always replace the blade cover before installing the blade.