GS108T Smart Switch Software Administration Manual
located. NEXT measures the amount of energy that is “returned” to the sender end. The factors that affect NEXT and cross talk are exactly the same as outlined in the “Return Loss” section. The
Patch Cables
When installing your equipment, replace old patch panel cables that do not meet Category 5e specifications. As pointed out in the “Near End Cross Talk” section, this near end piece of cable is critical for successful operation.
RJ-45 Plug and RJ-45 Connectors
In a Fast Ethernet network, it is important that all
Figure C-4 shows an RJ-45 plug and RJ-45 connector with built-in LEDs.
Figure C-4
Table
Table
Pin | Normal Assignment on Ports 1 to 8 | Uplink Assignment on Port 8 |
|
|
|
1 | Input receive data + | Output transmit data + |
|
|
|
2 | Input receive data – | Output transmit data – |
|
|
|
3 | Output transmit data + | Input receive data + |
|
|
|
|
|
|
| Network Cabling |