Chapter
First Entry Power-up and Configuration
Preparations
Hardware
Installation
and
Setup
First Entry
Configuration
There are four procedures necessary for setup of the new RMX. It is important that they are performed in the following sequence:
1
2Product Registration.
3Connection to MCU.
4Modifying the Default IP and ISDN/PSTN Service Settings (Fast Configuration Wizard).
Procedure 1: First-time Power-up
To power-up for the first time using the USB key:
1Insert the USB key containing the modified IP addresses in USB port on the RMX 1500 front panel and RMX 2000/4000 back panel.