Q-Logic 64 manual „ I/O blade latches can be easily disengaged during, Ventilation

Models: 64

1 244
Download 244 pages 38.52 Kb
Page 62
Image 62

4 – Installation Installing a Switch

D

CAUTION!

„ I/O blade latches can be easily disengaged during

 

installation. Ensure that all of the I/O blade latches are up and

 

locked prior to applying power to the switch.

 

„ If the switch is mounted in a closed or multi-unit rack

 

assembly, make sure that the operating temperature inside the

 

rack enclosure does not exceed the maximum rated ambient

 

temperature. Refer to ”Environmental” on page A-4.

 

„ The switch must rest on rails or a shelf in the rack or cabinet.

 

Allow 16 cm (6.5 in) minimum clearance at the front and rear of

 

the rack for service access and ventilation.

 

„ Do not restrict chassis air flow. Allow 16 cm (6.5 in) minimum

 

clearance at the front and rear of the rack for service access and

 

ventilation.

 

„ Multiple rack-mounted units connected to the AC supply

 

circuit may overload that circuit or overload the AC supply

 

wiring. Consider the power source capacity and the total power

 

usage of all switches on the circuit. Refer to ”Electrical” on

 

page A-3.

 

„ Reliable grounding in the rack must be maintained from the

 

switch chassis to the AC power source.

The switch is designed to be mounted in a rack using the mounting brackets and the SANbox2-64 rail kit shown in Figure 4-2. To mount the switch in a rack, do the following. Rack mounting instructions can also be found in the SANbox2-64 Rack Mounting Guide packaged with the switch.

4-4

59043-03 A

Page 62
Image 62
Q-Logic 64 „ I/O blade latches can be easily disengaged during, Locked prior to applying power to the switch, Ventilation