Chapter 5 - Point Commander

Using the Point Commander Application

In the advanced Commanding window, the point priority can be changed in the Priority drop-down field. The value of the point can be changed in the current highest priority field.

1.Click the drop-down arrow in the Priority field to choose the priority.

2.Click the arrows in the current highest priority field OR in the Present Value field to change the point value in the highest priority.

3.Click Command to initiate the change. The status of the command displays in the Feedback field.

When the point value is changed in the current highest priority field, the value will be reflected in the Present Value field once the change is initiated, and vice versa.

This procedure is now complete. Close the Commanding window by clicking the X in the top right corner of the window.

CAUTION

Release All Commanded Points

Remember to eventually release all commanded points to NULL priority so that the system is automatically controlled.

In the Current Value field on the Basic or Advanced Commander window, type N. NULL will be auto-filled into the field.

Failure to release commanded points may lead to unexpected results.

42

 

Siemens Industry, Inc.

125-3584T

Page 42
Image 42
Siemens 125-3584T manual Release All Commanded Points