Siemens 125-3584T manual Command Point ObjectsNotReleased

Models: 125-3584T

1 177
Download 177 pages 38.63 Kb
Page 81
Image 81

Chapter 10 - Create/Edit

Schedule/Command/Calendar

2.Click the value under the Priority column to change the exception priority. The Exception priority is the priority in which exception schedules are executed. If there are more than one exception schedules for the same time, the exception schedule with the higher priority will be executed.

3.Click the – sign at the bottom left of the window to delete an Exception Schedule.

Command Point ObjectsNotReleased

1.From within the Object Editor window, click the Command Point Objects button to open the Edit Command Objects window.

2.Click the + sign at the bottom left of the window to add a Command Object to the Schedule Object.

-Click the Object drop down to choose a reference objects or a Command Object.

-Enter a property identifier in the Property ID field.

 

81

Siemens Industry, Inc.

125-3584T

Page 81
Image 81
Siemens 125-3584T manual Command Point ObjectsNotReleased